Operations

Create, configure, reorder and archive the production operations that make up every routing, and set how parts are grouped and named at each one.

Available to manufacturers on the Factory Floor plan

An operation is one stage in your production: a production machine, a manual process or a quality control checkpoint, for example File Preparation, Printing, Dyeing, Sand blasting or Quality Control. Operations define where parts are tracked on the shop floor, and each step in a work order's routing is one operation. Your operations, in their sequence, are the building blocks of every routing, and each operation's settings decide how parts are moved, grouped and named when they reach it.

View your operations

Go to Settings > Manufacturing > Operations to see all the operations in your shop. The table has these columns:

  • Name: the unique name of the operation.
  • Group Prefix: a short label added to part groups as they pass through this operation, which helps organise and identify builds (for example Build or MJF-Build).
  • Duration: the time the operation takes, in hours.
  • Constraint: the rule that decides how parts are grouped before entering this operation, based on shared attributes (for example None, Material, or Material and Color).
  • Final Station: a check icon marks the last step in the routing, the end of the manufacturing process.
  • Actions: the Edit and Archive icons.

Add an operation

  1. Go to Settings > Manufacturing > Operations.
  2. Click New Operation. The Add new operation dialog opens.
  3. Enter a Status Name that clearly identifies the production step, machine or process, for example File Preparation, Printing, Dyeing, MJF, FDM, Mold Making or Quality Control.
  4. Optionally, set the Duration in hours.
  5. Choose the Step Type, View Type and Build Constraint.
  6. Optionally, turn on Allow Overproduction and the Notify on Order Completed automation.
  7. Click Save to create the operation.

Each setting is described under Operation settings.

New operations get the group name prefix Group and the Rename if Build Changed naming strategy. To change these or the sequence, edit the operation after you create it.

The new operation appears at the start of your production sequence. You can assign it to processes and post-processing options straight away, so parts are routed through it automatically. See Set up your routing.

Edit an operation

  1. Locate the operation in the list.
  2. Click the Edit (pencil) icon on its row. A dialog titled with the operation name opens.
  3. Change the settings you need.
  4. Click Save.

Operation settings

Status Name

The name of the step as it appears in your routing. Use it to name the specific machine, task or process this operation represents, for example MJFPrinting, Sand blasting or Painting.

Sequence

Edit only. The order of this operation in your production operations. Position 0 is the first operation, followed by 1, 2, 3 and so on. The sequence must stay before the final station. The Completed operation has no Sequence field and always stays last.

Operations always run in this global sequence, in every routing that is derived from your process configuration.

Group Name Prefix

Edit only. The prefix given to part groups when they enter this operation, for consistent tracking as builds move through production. The prefix cannot contain spaces. See Groups.

Step Naming Strategy

Edit only. How group names are handled when parts enter this operation:

  • Always Rename: applies the Group Name Prefix whenever a group enters this operation.
  • Rename if Build Changed: applies the Group Name Prefix only if the build's composition has changed since the previous step, for example because a part was removed from the group.
  • Inherit from Previous Step: keeps the group name from the previous operation when the group still holds the same parts. If the group changed, it keeps the previous prefix and assigns a new number.

Duration

The time the operation takes, in hours. Phasio uses it to calculate lead times. See Durations. The production schedule has its own, more detailed operation timings.

Step Type

How parts are progressed at this operation:

  • Base: parts must be moved manually from one operation to the next, individually or in bulk.
  • Download Parts as Group: operators can download the files of the parts heading into this operation as a group, for example to prepare them offline.
  • Upload Bill of Parts: like Download Parts as Group, and operators can also upload a nested .3mf file or a .csv bill of parts to stage the matching parts into a group.
  • Quality Control: labels the operation as an inspection step. Parts move through it the same way as through a Base operation.

The step type of the next operation decides which actions operators see when they move parts into it. See Operation-specific actions.

View Type

How parts at this operation are shown in the Backlog by default:

  • Part: show each part individually, for detailed tracking.
  • Group: show parts in their groups, using their group names.

Build Constraint

How parts are grouped when entering this operation:

  • None: no grouping; all parts are treated the same regardless of their specifications.
  • Material: group parts by material.
  • Material and Color: group parts by material and colour, for more specific batching.
  • Material and Sheet Thickness: group parts by material and sheet thickness.

Allow Overproduction

Lets operators move more parts out of this operation than its available balance, for example to cover yield loss and scrap. Operators see the extra quantity as +N next to the available quantity. This applies in the Backlog, not on the build screen, where the staged quantity is always capped at the part's pending units.

Automations

Notify on Order Completed: when progressing parts from this operation completes the work orders of one or more orders, operators see a Work orders completed at {operation} dialog. It lists the orders so the operator can open them or update their status, then click Continue.

Archive an operation

Operations are archived, not deleted.

  1. Click the Archive icon on the operation row.
  2. The confirmation dialog shows how many parts are actively in production at this operation, with a View parts link. Archiving is not blocked by these parts.
  3. Click Archive to confirm.

When you archive an operation:

  • It moves out of the live table into the Archived (N) section below it. Archived operations are read-only, and you cannot restore them.
  • It is removed from every process Workflows tab and from every post-processing Workflow Steps list, and can no longer be selected when you customise a work order's routing.
  • Every routing template that uses it is deprecated. A part specification whose default template was deprecated goes back to automatic routing. See Routing templates.
  • Existing work orders keep the operation in their routing, so they keep working. The Backlog keeps showing the operation, with an Archived badge, until no live parts or unfinished work orders use it.

You cannot archive the final station.